SKIP TO CONTENT
CAPABILITIES / 06 / GRID INTERCONNECTION

GRID INTERCONNECTION

Point of Common Coupling (PCC) design, DisCo synchronization protocols, and grid integration compliant with NERC requirements.

[ SYS.OP.PV ]
SOLAR PV
[ SYS.PCS.01 ]
HYBRID INVERTERS
[ SYS.BESS.01 ]
BESS
[ SYS.PROT.CTRL ]
POWERHOUSE
[ SYS.TRX.01 ]
TRANSFORMER
[ SYS.PCC.01 ]
PCC / DISCO NETWORK

SYSTEM INTERFACE

  • PCC protection relaying
  • Anti-islanding protection
  • Back-feed prevention
  • Voltage regulation
  • Frequency synchronisation
  • DisCo metering interface

REGULATORY COMPLIANCE

All interconnection work complies with NERC regulations and DisCo technical standards. Authorized work only — no unapproved PCC connections.

VIEW PROJECTarrow_forward